Projects don't just end — they close. Closeout is the moment you draw a line under the safety file for that project, confirm nothing is open, and archive it for the retention window. WorkSafe's 3-step wizard makes that a repeatable ritual instead of a scramble.
When to run the wizard
- All work on the project is complete.
- All open incidents have been closed.
- All open corrective actions have been closed or explicitly deferred.
- The last daily FLHA has been closed.
The 3-step wizard
Open the project and click Close out project.
- Safety audit — WorkSafe runs a compliance check: open FLHAs, open incidents, open CAs, pending acknowledgments, missing certs. Anything unresolved must be handled before proceeding.
- Checklist — the closing user works through the closeout checklist (return of equipment, waste disposal confirmation, site walk, final photos).
- Signature — the closing user signs off. Timestamp and identity are captured.
What happens on completion
- Project state moves to Closed. All forms, incidents, and CAs become read-only.
- WorkSafe automatically closes every open WorkSkedge task for the project — setup, daily FLHA, control assignments, and pending custom forms.
- If the company setting Close project in WorkSkedge is enabled, the WorkSkedge project also closes.
- The full closeout package is retained for the retention window and available for auditor download.