The site plan is the configuration surface for everything WorkSafe does on a project. Update the plan once and every downstream artifact — daily FLHAs, cert requirements, emergency screens — reflects the change instantly.
Everything included.
Standing hazards
Site-wide hazards that inject into every daily FLHA as mandatory review items — leads can't remove them.
Required certs
Project-required certs enforce at sign-in. Expired or missing certs alert the lead.
Muster point
Physical rally point or Company Vehicle default. Used by the Emergency Dashboard.
Emergency contacts
Primary and secondary contacts with tap-to-call on mobile. Nearest hospital resolves automatically.
FLHA cadence
Daily, per-shift, or event-driven. Missed FLHAs alert the safety manager.
See this on your own project.
A 30-minute demo walks through your workflow with your project structure — not a canned tour.